NCC Command Center / Dashboard
Total BOQ Value
₹68,39,180.00
Scheduled Value
₹8,41,260.00
Overall Progress
35.7%
Labor Requirement
142 MD
Project ERP Command
Real-time resource demand and schedule tracking enabled for Sector 43 Infrastructure.
Total BOQ Value
BOQ Distribution
Scheduled Value
Overall Progress
Labor Requirement
Trade Matrix
Real-time resource demand and schedule tracking enabled for Sector 43 Infrastructure.
| Item & Code | Qty | Total INR |
|---|---|---|
| #Excavation in all types of soil | 14.0 Cum | ₹3,500.00 |
| #PCC for Foundation | 46.0 Cum | ₹2,23,100.00 |
| #RCC for Footing | 23.0 Cum | ₹1,28,800.00 |
| #RCC for Columns | 14.0 Cum | ₹89,600.00 |
| #TMT Reinforcement Steel | 16.0 MT | ₹9,92,000.00 |
| #Plywood Formwork for Beams | 41.0 Sqm | ₹19,680.00 |
| #Brickwork in Superstructure | 25.0 Cum | ₹1,30,000.00 |
| #1.1.01 | 250.0 Cum | ₹500.00 |
| #1.2.05 | 5,600.0 Cum | ₹56,000.00 |
| #1.1.01Excavation | 1,500.0 Cum | ₹3,75,000.00 |
| #1.1.01Excavation | 1,500.0 Cum | ₹3,75,000.00 |
| #1.1.01Excavation | 1,500.0 Cum | ₹3,75,000.00 |
| #1.1.01Excavation | 1,500.0 Cum | ₹3,75,000.00 |
| #1.2.05M25 Concrete | 300.0 Cum | ₹16,80,000.00 |
| #1.2.05M25 Concrete | 30.0 Cum | ₹1,68,000.00 |
| #1.2.05M25 Concrete | 300.0 Cum | ₹16,80,000.00 |
| #1.2.05M25 Concrete | 30.0 Cum | ₹1,68,000.00 |